2010 CAROLINAS CHAPTER
INTERNATIONAL CONCRETE REPAIR INSTITUTE
PROJECT OF THE YEAR AWARD
As announced at the Annual Conference and in the last Connection
Newsletter, it is official; there is now a simplified PoY
Application!
In an effort to increase project submissions to our annual Project
of the Year Award program we have posted a more streamlined option
for submitting. Please note that this format is NOT able to be used
for submitting to the National ICRI.
The National PoY submission deadline is May and our Chapter is
September. If you are submitting a project to National in May you
can simple submit a copy of that to us by our deadline. Should your
project completion deadline miss the National you may utilize our
formatted template as part of your National submittal to reduce
duplication. Please follow the link to the National ICRI website for
updated rules and information.
This Express format is a two part process, Part A allows for
providing the general project information through a series of text
fields and drop down menus. To reduce the amount of typing you will
now use a series of check boxes for highlighting Material
Technology, Investigation Methods and Surface Preparation Methods.
Simply click and choose!
The only “storyline” typing required is the Abstract section in
which you will give a 500 word maximum overview of the project. The
last section is a 300 word maximum What Makes This Project a Winner
section.
The second document is Part B; this is just for your pictures. On
the very first page is a written set of instructions for you to
follow. You are free to submit up to 10 photos on the preset 6
pages.
That is it! Part A consists of 3 pages of simple information and
Part B is just inserting your photographs. Download the two
documents from the web, fill them out, save them, type us an email,
attach the documents and your submission is complete!
It is our hope that this new simplified method will increase
participation and allow you to highlight your projects.
Purpose:
To recognize outstanding achievment and innovation in the repairing
of concrete.
Criteria
1. Major portion of the project must be a concrete repair.
2. Project must be within the states of North Carolina, South
Carolina, Georgia, Virginia or Tennessee.
3. Concrete repair portion of project must be performed and
completed by an ICRI Carolinas Chapter member of record.
4. Project submitted for consideration must be completed after
January 1, 2008 or substantially completed before March 31, 2010.
5. Project submittals can be made by any ICRI Carolinas Chapter
member on any size concrete repair project.
6. More than one project may be submitted by any chapter member.
Submittal Process
1. Project solicitation will be in accordance to the rules and
regulations stated by this page. All submittals shall be completed
on the prepared forms that are available on the chapter website at
www.icricarolinas.org.
2. Entry submittals shall be in 8.5” x 11” format, with the
exception of drawings that may be 11” x 17” and folded. They shall
be submitted in a 3-ring binder.
3. A maximum total of 15 images can be included within the body of
the text or as appendices. Images may consist of photographs,
figures and/or drawings. Cover photographs shall be excluded from
this requirement.
4. Cover shall contain the project title and a maximum of 2
photographs and/or figures. No information regarding project
participants shall be on the cover.
5. Mailed project submittals shall be addressed and forwarded to:
ICRI Project Awards Committee, c/o Mr. Kelly Andrews, 8608
Timberwind Drive, Raleigh, North Carolina 27615, received no later
than 5:00 PM September 6, 2010.
6. Project submittal may be made electronically via email to:
kellybob@earthlink.net subject line MUST state ICRI PoY-Project
Name. File size may NOT exceed 2.0mb.
7. Electronically submitted entries that exceed 2.0 mb may be sent
in separate emails. Each additional email subject line must denote
PoY-Poject Name-Email 1 of ? or 2 of, etc.
Required Submittal Data (judges will downgrade project scoring if
some or all of the information below is not included with Submittal
Data)
1. The completed Project of the Year Award 2010 Submittal Form
(Download from top left of this page)
2. The contract price of the concrete repair portion of the project
must be included.
3. The project duration and/or the concrete repair duration must be
included.
Review Process
1. Four judges, selected by the ICRI Carolina Chapter awards
committee, will review and judge each project submittal and select
the project judged the best submitted for the award based on a
pre-established rating criterion which has been established by the
Carolina Chapter awards committee. The judges will be a Chapter
member of record representing two repair contractors, a material
supplier, and an engineer/architect who have not been named in the
project submittals.
Award and Project Presentation
1. The winning Concrete Repair Contracting Company which has the
highest project award submittal rating will receive a complimentary
Platinum Sponsorship for 2011 including.
a. A 3’x6’ logo banner displayed at all 3 Conferences
b. Company logo on the Chapter website with a link to the company’s
homepage,
c. Company logo on all conference agendas, newsletters, hospitality
board,
d. Free tabletop booth at each of the conferences.
2. The Concrete Repair Contracting Company award winner’s name will
also be included along with ICRI and other sponsors in the annual
Student Award.
3. Application and submittal fees of the project into the National
ICRI Project Award will be paid.
4. The project award winner will be contacted October 1, 2009 by the
awards committee.
5. Project of the Year Award is to be presented at the Annual
Convention in Charleston, SC on October 8 - 10, 2010.
|